Client’s Vision
The client wanted a gym floor that could still accommodate assemblies, banquets, and other events, while providing a surface more suited for sports that could withstand heavy use—including chairs, tables, and even high heels.
To provide a durable, multi-functional gym floor that supported both athletic activities and community events, while reflecting the school’s identity.
We measured all playground equipment and determined that covering the entire playground with a poured material would be most effective. This material, made from reground tires and coated with a durable, colorized top layer, was tested and approved to handle falls from heights of up to 12 feet.
Existing VCT flooring was removed (the school contracted this prior to our arrival).
The poured court was installed over the prepared surface, with careful attention to detail to accurately reproduce the school’s center logo.
The installation process took approximately a week and a half, ensuring a precise, high-quality finish.