Skip to main content

Fitness Floors

Case Study · Playground Surfacing

Christ the King Church School

Replacing a high-maintenance mulch playground with a safe, durable, poured-in-place rubberized surface built to protect children and eliminate ongoing upkeep.

Project Overview

The challenge

Christ the King Church School, one of the largest private schools in the area, had used their gym for decades for a variety of activities, including school assemblies, community meetings, and fish fries. The gym featured VCT tiling, which was functional for diverse events but not ideal for students playing court sports.

Client’s Vision

The client wanted a gym floor that could still accommodate assemblies, banquets, and other events, while providing a surface more suited for sports that could withstand heavy use—including chairs, tables, and even high heels.

Our Goal

To provide a durable, multi-functional gym floor that supported both athletic activities and community events, while reflecting the school’s identity.

Strategy

A poured-in-place safety surface

We measured all playground equipment and determined that covering the entire playground with a poured material would be most effective. This material, made from reground tires and coated with a durable, colorized top layer, was tested and approved to handle falls from heights of up to 12 feet.
Solution

1

Existing VCT flooring was removed (the school contracted this prior to our arrival).

2

The poured court was installed over the prepared surface, with careful attention to detail to accurately reproduce the school’s center logo.

3

The installation process took approximately a week and a half, ensuring a precise, high-quality finish.
The Transformation

From high-maintenance mulch to a safe, colorful surface

Before the project, the gym had a worn VCT floor that was not ideal for sports, though it accommodated multi-purpose activities. After installation, the gym features a colorful, durable poured court that enhances safety for athletes and expresses the school’s identity visually. The surface continues to support assemblies, fish fries, and other events, and any future wear or fading can be addressed with cost-effective recoating, including updated logos and graphics.
Loose mulch — tracked indoors, refilled annually, limited fall protection.
Poured-in-place rubberized surface — safe, colorful and maintenance-free.
 

“

The new playground surface completely transformed our space. The kids are safer, it looks fantastic, and we’ve eliminated the constant mulch refills. Fitness Floors delivered exactly what we envisioned and more.

Marcus Thompson,
Owner, Sky High Sports Complex
Conclusion

Installed in two weeks, with zero equipment removed

The poured court has successfully balanced functionality, safety, and aesthetics. The school now enjoys a long-lasting, vibrant gym floor that supports both athletic and community events, while offering an affordable option for future updates.