Shepherd Community Center

Replacing a high-maintenance mulch playground with a safe, durable, poured-in-place rubberized surface built to protect children and eliminate ongoing upkeep.

Project Overview

The challenge

Shepherd Community Center had an existing playground with a mulch surface. The mulch was frequently tracked throughout the facility by children, requiring annual refills. Additionally, the mulch did not provide adequate protection for potential falls from the playground equipment.

Client’s Vision

The client wanted a playground surface that was low-maintenance, provided sufficient protection for children in case of falls, and remained visually appealing.

Our Goal

To replace the existing mulch with a durable, safe, and attractive surface that minimized maintenance needs while ensuring child safety.

Strategy

A poured-in-place safety surface

We measured all playground equipment and determined that covering the entire playground with a poured material would be most effective. This material, made from reground tires and coated with a durable, colorized top layer, was tested and approved to handle falls from heights of up to 12 feet.

1

Removing all existing mulch from the playground area.

2

Excavating to prepare a stable gravel sub-base.

3

Blowing in a 3.5″ layer of reground rubber mulch.

4

Applying a 1.5″ poured-in-place colorful rubberized top coat.
The Transformation

From high-maintenance mulch to a safe, colorful surface

Before, the playground relied on a mulch surface that required constant refilling and offered limited protection. After installation, it became a safe, low-maintenance space with a colorful, durable rubber surface that fully protected children and eliminated the need for ongoing upkeep.

Loose mulch — tracked indoors, refilled annually, limited fall protection.
Poured-in-place rubberized surface — safe, colorful and maintenance-free.
 

“

The new playground surface completely transformed our space. The kids are safer, it looks fantastic, and we’ve eliminated the constant mulch refills. Fitness Floors delivered exactly what we envisioned and more.

Facility Director
Shepherd Community Center
Conclusion

Installed in two weeks, with zero equipment removed

Because the surface was blown in and poured in place, no playground equipment needed to be dismantled. The project was completed in approximately two weeks. That school year, children enjoyed a safe, comfortable playground surface, and the facility benefited from a maintenance-free solution.